Campus Planning Docs

Campus Planning Docs

File Name (As Shown in Website Text)

Document

Publicly Accessible Link to Document

 

File Name (As Shown in Website Text)

Document

Publicly Accessible Link to Document

 

Environmental Impact Reports Drawer

 

Notice of Determination — Subsequent EIR (2025)

 

 

 

Notice of Determination — 2018 LRDP EIR (2018)

 

 

 

Addendum No. 1 – Franklin Antonio Hall (PDF)

 

 

 

NOD – Franklin Antonio Hall (PDF)

 

 

 

Addendum No. 2 – Design and Innovation Building (PDF)

 

 

 

NOD – Design and Innovation Building (PDF)

 

 

 

Addendum No. 4 – Pepper Canyon Amphitheater, Public Realm Improvements, and Warren Field House Replacement Project (PDF)

 

 

 

NOD – Pepper Canyon Amphitheater, Public Realm Improvements, and Warren Field House Replacement Project (PDF)

 

 

 

Addendum No. 5 – Theatre District Living and Learning Neighborhood (PDF)

 

 

 

NOD – Theatre District Living and Learning Neighborhood (PDF)

 

 

 

Addendum No. 6 – Central Utility Plant Expansion – Chiller Addition (PDF)

 

 

 

NOD – Central Utility Plant Expansion – Chiller Addition (PDF)

 

 

 

Addendum No. 7 – Erosion Repair and Parking Lot (South of VA) (PDF)

 

 

 

NOD – Erosion Repair and Parking Lot (South of VA) (PDF)

 

 

 

Addendum No. 8 – Pepper Canyon Ancillary Site Work (PDF)

 

 

 

NOD – Pepper Canyon Ancillary Site Work (PDF)

 

 

 

Addendum No. 9 – Pepper Canyon West Housing (PDF)

 

 

 

NOD – Pepper Canyon West Housing (PDF)

 

 

 

Addendum No. 10 – Viterbi Family Vision Research Center (PDF)

 

 

 

NOD – Viterbi Family Vision Research Center (PDF)

 

 

 

Addendum No. 11 – Triton Center (PDF)

 

 

 

NOD – Triton Center (PDF)

 

 

 

Addendum No. 12 – Ridge Walk North Living and Learning Neighborhood (PDF)

 

 

 

NOD – Ridge Walk North Living and Learning Neighborhood (PDF)

 

 

 

Addendum No. 13 – Science Research Park (PDF)

 

 

 

NOD – Science Research Park (PDF)

 

 

 

Hillcrest Campus 2019 LRDP – Addendum No. 1: Phase 1, Outpatient Pavilion and Parking Structure Project (PDF)

 

 

 

NOD – Phase 1, Outpatient Pavilion and Parking Structure Project (PDF)

 

 

 

Hillcrest Campus 2019 LRDP – Addendum No. 2: Phase 1B, Bachman Widening, North Access Driveway, Demolition (PDF)

 

 

 

NOD – Phase 1B, Bachman Widening, North Access Driveway, Demolition (PDF)

 

 

 

8980 Villa La Jolla Drive Project – Volume I: Final EIR (PDF)

 

 

 

8980 Villa La Jolla Drive Project – Volume II, Part 1: Technical Appendices A–E (PDF)

 

 

 

8980 Villa La Jolla Drive Project – Volume II, Part 2: Technical Appendices F–I (PDF)

 

 

 

Rancho Bernardo Healthcare Center – Final Mitigated Negative Declaration (RBHC MOB Project) (PDF)

 

 

 

NOD – Rancho Bernardo Healthcare Center MOB Project (PDF)

 

 

 

Ecological Reserve Flyer (PDF)

 

 

 

Ecological Reserve Habitat Management Plan (PDF)

 

 

 

Ecological Reserve 2024 Annual Report (PDF)